Top left banner Top right banner
prev next
Bottom left banner Bottom right banner

Feb. 9, 2024

Navy Releases Draft Environmental Assessment and Will Host Open House Public Meetings for Homeporting Constellation-Class Frigates at Naval Station Everett, Washington

The Navy invites the public to review and comment on the Draft Environmental Assessment (EA) prepared for homeporting Constellation-class frigates at Naval Station Everett, Washington (WA). Under the Proposed Action, the Navy would homeport up to 12 Constellation-class frigates; construct training and support facilities for ships, commands, and

Dec. 8, 2023

Navy Announces Finding of No Significant Impact for the Environmental Assessment for Homeporting of Columbia Class Submarines at Naval Submarine Base Kings Bay

The Navy has completed the Environmental Assessment (EA) for homeporting of the Columbia Class submarines at Naval Submarine Base (NSB) Kings Bay, and has determined that implementation of the Proposed Action (Action Alternative) will not significantly impact the quality of the human or natural environment. Therefore, the preparation of an

Nov. 17, 2023

Navy Announces Supplemental EIS/OEIS for Atlantic Fleet Training and Testing

Navy to Begin Supplemental EIS/OEIS for Atlantic Fleet Training and Testing

Sept. 8, 2023

Navy Announces Release of the Final Environmental Assessment/Finding of No Significant Impact for the Multi-Engine Training System

The Navy has released a Final Environmental Assessment (EA) for replacement of 54 T-44C Pegasus with 58 new T-54A aircraft and the upgrade of ground-based training technologies at Naval Air Station (NAS) Corpus Christi, Texas, collectively referred to as the Multi-Engine Training System (METS). The EA has determined that there will not be

Sept. 8, 2023

Navy Announces Release of the Final Environmental Assessment/Finding of No Significant Impact for the Multi-Engine Training Syste

The Navy has released a Final Environmental Assessment (EA) for replacement of 54 T-44C Pegasus with 58 new T-54A aircraft and the upgrade of ground-based training technologies at Naval Air Station (NAS) Corpus Christi, Texas, collectively referred to as the Multi-Engine Training System (METS). The EA has determined that there will not be

July 28, 2023

El Departamento Naval Continuará Aceptando Comentarios hasta el 12 de Agosto para la Declaración de Impacto Ambiental Suplementaria para Actualizar su Análisis para Mejorar las Instalaciones de la Base de Operaciones para Tres Portaaviones Clase NIMITZ en la Estación Aeronaval (NAS por sus siglas en

Debido a los problemas encontrados por algunos comentaristas con el proceso de envío de comentarios a través del sitio web del proyecto, el Departamento Naval continuará aceptando comentarios por correo electrónico y postal para la Declaración de Impacto Ambiental Suplementaria (SEIS por sus siglas en inglés) para mejorar las instalaciones del

July 28, 2023

Navy Will Continue to Accept Comments Until August 12 for the Supplemental Environmental Impact Statement to Update its Analysis for Improving Homeport Facilities for Three NIMITZ-Class Aircraft Carriers at NAS North Island

Due to issues experienced by some commenters with submitting comments to the project website, the Navy will continue to accept comments via e-mail and mail for the Supplemental Environmental Impact Statement (SEIS) for Improving Homeport Facilities for Three NIMITZ-Class Aircraft Carriers at Naval Air Station (NAS) North Island until August 12.The

June 23, 2023

Navy Extends Public Comment Period for the Draft Environmental Assessment for Homeporting of Columbia Class Submarines at Naval Submarine Base Kings Bay

The Navy has extended the public comment period for the Draft Environmental Assessment (EA) for the homeporting of the Columbia Class submarines at Naval Submarine Base (NSB) Kings Bay.  The comment period was originally scheduled to expire on June 25, but will now expire on July 24.The Draft EA is available for review at

June 23, 2023

Navy Extends Public Comment Period for the Draft Environmental Assessment for Homeporting of Columbia Class Submarines at Naval Submarine Base Kings Bay

The Navy has extended the public comment period for the Draft Environmental Assessment (EA) for the homeporting of the Columbia Class submarines at Naval Submarine Base (NSB) Kings Bay.  The comment period was originally scheduled to expire on June 25, but will now expire on July 24.The Draft EA is available for review at

June 16, 2023

Navy Announces Release of the Multi-Engine Training System Draft Environmental Assessment

The Navy has released a draft Environmental Assessment (EA) for the Multi-Engine Training System (METS). Implementation of the METS will replace all 54 of the T-44C Pegasus aircraft with 58 new T-54A aircraft at Naval Air Station (NAS) Corpus Christi, Texas. The new aircraft would conduct training operations in the same locations and within the